PROJECT:
GO Transit Control Centre
| Type: | Duct & Cable Chamber System | ||
|---|---|---|---|
| Project Title: | GO Transit Control Centre | ||
| Location: | Oakville, ON | ||
| Description: | 347m of power and communication duct banks ranging in size from 4-4″ to 18-4″ ducts, plus 10 precast manhole chambers including installing 10 pipe duct bank across 5-lane driveway while maintining access and egress for all vehicular traffic. Proximity of shale to surface required rock excavation for lower portion of all chambers. | ||
PROJECT:
GO Transit Control Centre
| Type: | Duct & Cable Chamber System | ||
|---|---|---|---|
| Project Title: | GO Transit Control Centre | ||
| Location: | Oakville, ON | ||
| Description: | 347m of power and communication duct banks ranging in size from 4-4″ to 18-4″ ducts, plus 10 precast manhole chambers including installing 10 pipe duct bank across 5-lane driveway while maintining access and egress for all vehicular traffic. Proximity of shale to surface required rock excavation for lower portion of all chambers. | ||